Edgecombe Solar LLC / EDGCM
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 75 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-10aa8de3380a29999cb63544 |
| Net Summer Capacity (MW) | 75 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-10aa8de3380a29999cb63544 |
| Net Winter Capacity (MW) | 75 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-10aa8de3380a29999cb63544 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 49893 |
| Entity Name | Invenergy Services LLC |
| Plant ID | 70023 |
| Plant Name | Edgecombe Solar LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NC |
| County | Edgecombe |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | EDGCM |
| Nameplate Capacity (MW) | 75 |
| Net Summer Capacity (MW) | 75 |
| Net Winter Capacity (MW) | 75 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 9 |
| Planned Operation Year | 2027 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 35.949381 |
| Longitude | -77.65926 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1060 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2544
Sources EV-f2f3d55bf738afa047bdcf70Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f49c4e504b39c22944e0344047fb5b872a9e1b8bf9f40eb60a94d9987e5a81ea
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1060
Sources EV-10aa8de3380a29999cb63544Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c093c5ff4bf10b9c1b32e4bd381108df239800774ccd301a9a6d3df78921be29
Usage terms US government public domain