Monroe Route 35 Solar LLC / MONRO
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 3 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-398c6bf98c864bb89acc84a5 |
| Net Summer Capacity (MW) | 3 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-398c6bf98c864bb89acc84a5 |
| Net Winter Capacity (MW) | 3 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-398c6bf98c864bb89acc84a5 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 65677 |
| Entity Name | Dimension Energy LLC |
| Plant ID | 70004 |
| Plant Name | Monroe Route 35 Solar LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | PA |
| County | Juniata |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | MONRO |
| Nameplate Capacity (MW) | 3 |
| Net Summer Capacity (MW) | 3 |
| Net Winter Capacity (MW) | 3 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 12 |
| Planned Operation Year | 2026 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 40.685584 |
| Longitude | -77.13704 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:585 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2527
Sources EV-bf0ca341acf4844b74454eaeEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 93882c389663859f2c85a50fc5d0a1f1cda036ba56ca20f88c7bba8a726c15ad
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:585
Sources EV-398c6bf98c864bb89acc84a5Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 407a4184e098e6a6a6d9394df5ba66bee5038e5e5ec1f9f347f3b85649658927
Usage terms US government public domain
