Votaw Solar Station / VT1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 141 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-5c157a1ddd899032972ac10a |
| Net Summer Capacity (MW) | 141 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-5c157a1ddd899032972ac10a |
| Net Winter Capacity (MW) | 141 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-5c157a1ddd899032972ac10a |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 11241 |
| Entity Name | Entergy Louisiana LLC |
| Plant ID | 69993 |
| Plant Name | Votaw Solar Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Hardin |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | VT1 |
| Nameplate Capacity (MW) | 141 |
| Net Summer Capacity (MW) | 141 |
| Net Winter Capacity (MW) | 141 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 5 |
| Planned Operation Year | 2029 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 30.4355 |
| Longitude | -94.673 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1897 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2516
Sources EV-77cc779ff79c7a8f73955793Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e854f8a5d39c84ab737f21555c8f3d73f61db28a1f6c4196beca865801664158
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1897
Sources EV-5c157a1ddd899032972ac10aEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 3c0db899816c5c2d16ccedc4b14235d067bd3d586e2b46c269e27af8c7f2dfae
Usage terms US government public domain
