Arkansas Cypress Solar Station / PB1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 600 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-d60d560399aebc4b50b26d76 |
| Net Summer Capacity (MW) | 600 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-d60d560399aebc4b50b26d76 |
| Net Winter Capacity (MW) | 600 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-d60d560399aebc4b50b26d76 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 814 |
| Entity Name | Entergy Arkansas LLC |
| Plant ID | 69989 |
| Plant Name | Arkansas Cypress Solar Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AR |
| County | Jefferson |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | PB1 |
| Nameplate Capacity (MW) | 600 |
| Net Summer Capacity (MW) | 600 |
| Net Winter Capacity (MW) | 600 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 1 |
| Planned Operation Year | 2029 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 34.42 |
| Longitude | -92.08 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1845 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2511
Sources EV-6e57f448a18015c3260d9a9fEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 959b4ea50a268103ce60b647d88a6667c558e3212a163df568a1cff7e3aeae2c
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1845
Sources EV-d60d560399aebc4b50b26d76Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ca1c1a2ab6f553d3b9ed6f515834a28a92ca68293e853001ae32892704c03177
Usage terms US government public domain