United States of America · Generator · plant location

Cypress Harvest Solar Station / CH2

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Entergy Louisiana LLC
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
30.237835, -91.26486

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Cypress Harvest Solar Station / CH2

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)200 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-50555b481d8b55fab0e3608c
Net Summer Capacity (MW)200 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-50555b481d8b55fab0e3608c
Net Winter Capacity (MW)200 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-50555b481d8b55fab0e3608c
Detailed source fields
Original source fieldPublished value or condition
Entity ID11241
Entity NameEntergy Louisiana LLC
Plant ID69952
Plant NameCypress Harvest Solar Station
Google MapMap
Bing MapMap
Plant StateLA
CountyIberville
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDCH2
Nameplate Capacity (MW)200
Net Summer Capacity (MW)200
Net Winter Capacity (MW)200
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month9
Planned Operation Year2029
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude30.237835
Longitude-91.26486
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1979

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2483

Sources EV-fb6fbe7462ae34c1291b5fc4
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f44354caacdfe3a015fd2ba77ef7db2831bf875ff07481937d06277016bb2627

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1979

Sources EV-50555b481d8b55fab0e3608c
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 2dd5e2c62dcf54802d94599915c0a4a87e635f9da6eb986a4c743991b6c907ec

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel