Pointe Coupee Power Station / PC1A
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 469.3 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-56bb71e856d59b22a67b50e4 |
| Net Summer Capacity (MW) | 435.4 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-56bb71e856d59b22a67b50e4 |
| Net Winter Capacity (MW) | 469.3 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-56bb71e856d59b22a67b50e4 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 11241 |
| Entity Name | Entergy Louisiana LLC |
| Plant ID | 69944 |
| Plant Name | Pointe Coupee Power Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | LA |
| County | Pointe Coupee |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | PC1A |
| Unit Code | PC01 |
| Nameplate Capacity (MW) | 469.3 |
| Net Summer Capacity (MW) | 435.4 |
| Net Winter Capacity (MW) | 469.3 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Planned Operation Month | 10 |
| Planned Operation Year | 2031 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 30.739 |
| Longitude | -91.377 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:2288 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2467
Sources EV-d3d123d9c227afa549515883Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 72c9aa6201aaef2d0e2ae112924331956a3ba760d3b7c938d58660df52ceaadb
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:2288
Sources EV-56bb71e856d59b22a67b50e4Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f131ad1f2d40e707f8a0c2fbff9ed4ac43ea2a795d2232548da180199e2d11c2
Usage terms US government public domain