Teeple Creek / TEEPL
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 2.5 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-2d37de51400a3d70bf2264c6 |
| Net Summer Capacity (MW) | 2.5 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-2d37de51400a3d70bf2264c6 |
| Net Winter Capacity (MW) | 2.5 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-2d37de51400a3d70bf2264c6 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 66783 |
| Entity Name | OneEnergy, Inc. |
| Plant ID | 69940 |
| Plant Name | Teeple Creek |
| Google Map | Map |
| Bing Map | Map |
| Plant State | IA |
| County | Allamakee |
| Balancing Authority Code | MISO |
| Sector | IPP Non-CHP |
| Generator ID | TEEPL |
| Nameplate Capacity (MW) | 2.5 |
| Net Summer Capacity (MW) | 2.5 |
| Net Winter Capacity (MW) | 2.5 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 12 |
| Planned Operation Year | 2026 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 43.234672 |
| Longitude | -91.50468 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:575 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2466
Sources EV-cc4f416dd44b8488108b820eEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 4583acebd408dadf972e99c279ca3a618083ec2945dc51706ecbd52ad891e96f
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:575
Sources EV-2d37de51400a3d70bf2264c6Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 826f179eda2f3c54646a5a55f82599936dc7022cd8ba13d7c61e8c37ceaedf04
Usage terms US government public domain