Ringe / RINGE
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 2.5 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-efd2b46de14559e4989da151 |
| Net Summer Capacity (MW) | 2.5 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-efd2b46de14559e4989da151 |
| Net Winter Capacity (MW) | 2.5 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-efd2b46de14559e4989da151 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 66783 |
| Entity Name | OneEnergy, Inc. |
| Plant ID | 69938 |
| Plant Name | Ringe |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MN |
| County | Olmsted |
| Balancing Authority Code | MISO |
| Sector | IPP Non-CHP |
| Generator ID | RINGE |
| Nameplate Capacity (MW) | 2.5 |
| Net Summer Capacity (MW) | 2.5 |
| Net Winter Capacity (MW) | 2.5 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 10 |
| Planned Operation Year | 2026 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 44.107842 |
| Longitude | -92.40043 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:295 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2464
Sources EV-a989175be5d7b5a9146c425cEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f06e58350f285ec12331451a3c1a252304d608361c87e7478420d7a6c910cdfc
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:295
Sources EV-efd2b46de14559e4989da151Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ce682440ee33970d307fdc324147e4ee5dc5065f580b5e4d4857362098159335
Usage terms US government public domain
