Murphysboro 1 / MURP1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 5 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-ce14783d83d52ccf76152266 |
| Net Summer Capacity (MW) | 5 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-ce14783d83d52ccf76152266 |
| Net Winter Capacity (MW) | 5 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-ce14783d83d52ccf76152266 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 62836 |
| Entity Name | Navisun LLC |
| Plant ID | 69859 |
| Plant Name | Murphysboro 1 |
| Google Map | Map |
| Bing Map | Map |
| Plant State | IL |
| County | Jackson |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | MURP1 |
| Nameplate Capacity (MW) | 5 |
| Net Summer Capacity (MW) | 5 |
| Net Winter Capacity (MW) | 5 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 10 |
| Planned Operation Year | 2027 |
| Status | (T) Regulatory approvals received. Not under construction |
| Latitude | 37.794585 |
| Longitude | -89.35141 |
| Original text | (T) Regulatory approvals received. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1106 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2412
Sources EV-c1d7538e52adba7d84bb3201Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1ee232cef34cd693d2ed2bb5aec61f4a271b8f91b9cdf56ae0371e5f13abbda4
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1106
Sources EV-ce14783d83d52ccf76152266Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 dbc2332a35b553465bbf89c99636022e4e7ced929779fdcadab91ffb50df86b4
Usage terms US government public domain
