Hashknife Energy Center II LLC / HK2SO
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 200 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-e5428cd63e35cac3643bcab3 |
| Net Summer Capacity (MW) | 200 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-e5428cd63e35cac3643bcab3 |
| Net Winter Capacity (MW) | 200 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-e5428cd63e35cac3643bcab3 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 49893 |
| Entity Name | Invenergy Services LLC |
| Plant ID | 69779 |
| Plant Name | Hashknife Energy Center II LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AZ |
| County | Navajo |
| Balancing Authority Code | AZPS |
| Sector | IPP Non-CHP |
| Generator ID | HK2SO |
| Nameplate Capacity (MW) | 200 |
| Net Summer Capacity (MW) | 200 |
| Net Winter Capacity (MW) | 200 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 3 |
| Planned Operation Year | 2027 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 34.574259 |
| Longitude | -110.4946 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:725 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2164
Sources EV-ec79cec98944591a7ecec968Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 719f3247197cfaf10d19e4aace83be3f5d00a49dabac47ec78d02fe52b9f1143
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:725
Sources EV-e5428cd63e35cac3643bcab3Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 20ae2bf4e6d95b9b831d106f8512580106202acf18c29c1a2db1103fe6f015b8
Usage terms US government public domain