Hashknife Energy Center LLC / HK1ST
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 275 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-f8313fef32cb4e48d3a2e394 |
| Net Summer Capacity (MW) | 275 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-f8313fef32cb4e48d3a2e394 |
| Net Winter Capacity (MW) | 275 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-f8313fef32cb4e48d3a2e394 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 49893 |
| Entity Name | Invenergy Services LLC |
| Plant ID | 69778 |
| Plant Name | Hashknife Energy Center LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AZ |
| County | Navajo |
| Balancing Authority Code | AZPS |
| Sector | IPP Non-CHP |
| Generator ID | HK1ST |
| Nameplate Capacity (MW) | 275 |
| Net Summer Capacity (MW) | 275 |
| Net Winter Capacity (MW) | 275 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 9 |
| Planned Operation Year | 2026 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 34.574259 |
| Longitude | -110.4946 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:139 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2163
Sources EV-270cd3b2b6b27e8e84eec23bEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 3f30653c98c7bd1e875fc8f6fbae18d8898ac0f5d4f109b739faf9fd38b6be42
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:139
Sources EV-f8313fef32cb4e48d3a2e394Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 15164822c6e1c7b054859e5eae29f01f3cc21aeded124efd1be6638f9d44e52f
Usage terms US government public domain