Hashknife Energy Center LLC / HK1SO
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 275 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-979555805411b584fb634f0a |
| Net Summer Capacity (MW) | 275 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-979555805411b584fb634f0a |
| Net Winter Capacity (MW) | 275 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-979555805411b584fb634f0a |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 49893 |
| Entity Name | Invenergy Services LLC |
| Plant ID | 69778 |
| Plant Name | Hashknife Energy Center LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AZ |
| County | Navajo |
| Balancing Authority Code | AZPS |
| Sector | IPP Non-CHP |
| Generator ID | HK1SO |
| Nameplate Capacity (MW) | 275 |
| Net Summer Capacity (MW) | 275 |
| Net Winter Capacity (MW) | 275 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 9 |
| Planned Operation Year | 2026 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 34.574259 |
| Longitude | -110.4946 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:138 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2162
Sources EV-c832c548fb4884b192154d87Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 17c37532d908f879b7a5df4107db3c56074c67083443c207390c2fc64995a0c5
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:138
Sources EV-979555805411b584fb634f0aEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 683e36d355de3895f6515ba897193fa37937af17e98c648cfdf81fae7f53ec48
Usage terms US government public domain
