United States of America · Generator · plant location

Mohave Energy Park / GT4

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Arizona Electric Pwr Coop Inc
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
34.932499, -114.548

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Mohave Energy Park / GT4

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)60.5 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-73708e853f6e03b331857edc
Net Summer Capacity (MW)43 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-73708e853f6e03b331857edc
Net Winter Capacity (MW)43 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-73708e853f6e03b331857edc
Detailed source fields
Original source fieldPublished value or condition
Entity ID796
Entity NameArizona Electric Pwr Coop Inc
Plant ID69773
Plant NameMohave Energy Park
Google MapMap
Bing MapMap
Plant StateAZ
CountyMohave
Balancing Authority CodeWALC
SectorElectric Utility
Generator IDGT4
Nameplate Capacity (MW)60.5
Net Summer Capacity (MW)43
Net Winter Capacity (MW)43
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Planned Operation Month12
Planned Operation Year2027
Status(L) Regulatory approvals pending. Not under construction
Latitude34.932499
Longitude-114.548
Original text(L) Regulatory approvals pending. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1365

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2159

Sources EV-ba19d7103a555bb7fbf2d1cf
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 996b7a912879007549d9d3fa61268c7d4178c617a08af57419def8877227c4a9

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1365

Sources EV-73708e853f6e03b331857edc
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 eda3d70f373dde7a5c2aacfcff6ede8d5366ff755185a22cd1a36a5a57b38651

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel