Mohave Energy Park / GT3
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 60.5 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-da26a14ef0d104bdd2fe1913 |
| Net Summer Capacity (MW) | 43 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-da26a14ef0d104bdd2fe1913 |
| Net Winter Capacity (MW) | 43 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-da26a14ef0d104bdd2fe1913 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 796 |
| Entity Name | Arizona Electric Pwr Coop Inc |
| Plant ID | 69773 |
| Plant Name | Mohave Energy Park |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AZ |
| County | Mohave |
| Balancing Authority Code | WALC |
| Sector | Electric Utility |
| Generator ID | GT3 |
| Nameplate Capacity (MW) | 60.5 |
| Net Summer Capacity (MW) | 43 |
| Net Winter Capacity (MW) | 43 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 12 |
| Planned Operation Year | 2027 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 34.932499 |
| Longitude | -114.548 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1364 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2158
Sources EV-7ecb4439e0c96b1c865ebb72Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7b10bc219fb7d58a05b7d26c9fc5b94a6946d008085d000c4a83e423f875a2ab
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1364
Sources EV-da26a14ef0d104bdd2fe1913Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 dddea6566ce50c7d39f1bcfc3b8705096980c82c71686d2ba2ea9316d1d49416
Usage terms US government public domain