Mohave Energy Park / GT2
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 60.5 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-484637857190aa6aa2051d19 |
| Net Summer Capacity (MW) | 43 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-484637857190aa6aa2051d19 |
| Net Winter Capacity (MW) | 43 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-484637857190aa6aa2051d19 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 796 |
| Entity Name | Arizona Electric Pwr Coop Inc |
| Plant ID | 69773 |
| Plant Name | Mohave Energy Park |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AZ |
| County | Mohave |
| Balancing Authority Code | WALC |
| Sector | Electric Utility |
| Generator ID | GT2 |
| Nameplate Capacity (MW) | 60.5 |
| Net Summer Capacity (MW) | 43 |
| Net Winter Capacity (MW) | 43 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 12 |
| Planned Operation Year | 2027 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 34.932499 |
| Longitude | -114.548 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1363 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2157
Sources EV-359fd5bf43d16d43d63a1767Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7b4f61539a14bfa1ca1d07db991021c61f631fce835a2ccfbbd3c12405de2f4b
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1363
Sources EV-484637857190aa6aa2051d19Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ef3d2c78be5832957bdfc69c1c410620a5b5006cb6b92820605215d13bf51324
Usage terms US government public domain
