Rock Island Generation Project / RIG2
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 20.3 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-1bf93277840d3a82d1cfd60b |
| Net Summer Capacity (MW) | 19.9 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-1bf93277840d3a82d1cfd60b |
| Net Winter Capacity (MW) | 19.9 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-1bf93277840d3a82d1cfd60b |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 67625 |
| Entity Name | Kerrville Public Utility Board Public Facility Corp |
| Plant ID | 69760 |
| Plant Name | Rock Island Generation Project |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Colorado |
| Balancing Authority Code | ERCO |
| Sector | Electric Utility |
| Generator ID | RIG2 |
| Nameplate Capacity (MW) | 20.3 |
| Net Summer Capacity (MW) | 19.9 |
| Net Winter Capacity (MW) | 19.9 |
| Technology | Natural Gas Internal Combustion Engine |
| Energy Source Code | NG |
| Prime Mover Code | IC |
| Planned Operation Month | 9 |
| Planned Operation Year | 2027 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 29.55068 |
| Longitude | -96.53675 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1033 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2137
Sources EV-b528a3ebd14df78ada98b5ebEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 4212174d5ed44ef516220fe64a3276150fe9facced28cb3bc76e9df57f1415c5
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1033
Sources EV-1bf93277840d3a82d1cfd60bEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5009d291c83348ba5d49ab31561980cf81c8a5e1d724b894066f4f083eac0cd1
Usage terms US government public domain