Ironwood Power Station / 1A
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 467.3 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-9afd7e1f64725df14c794b64 |
| Net Summer Capacity (MW) | 432 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-9afd7e1f64725df14c794b64 |
| Net Winter Capacity (MW) | 467.3 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-9afd7e1f64725df14c794b64 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 814 |
| Entity Name | Entergy Arkansas LLC |
| Plant ID | 69750 |
| Plant Name | Ironwood Power Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AR |
| County | Hot Spring |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | 1A |
| Nameplate Capacity (MW) | 467.3 |
| Net Summer Capacity (MW) | 432 |
| Net Winter Capacity (MW) | 467.3 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 7 |
| Planned Operation Year | 2028 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 34.433826 |
| Longitude | -92.9042 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1623 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2130
Sources EV-80f759b9113dee3733ced939Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 049a8265c2f1e72dc25b15be8ac07733d960b17a1552142f3fa1d5b104d6ad29
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1623
Sources EV-9afd7e1f64725df14c794b64Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4c81786ff849f4355ce017d8fa6d9c59bde6c07c33bab8fc9d53fd4468aed851