Liberty Station / L3
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 18.1 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-2a8a6deb63163a29ba003989 |
| Net Summer Capacity (MW) | 17.8 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-2a8a6deb63163a29ba003989 |
| Net Winter Capacity (MW) | 17.8 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-2a8a6deb63163a29ba003989 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 5580 |
| Entity Name | East Kentucky Power Coop, Inc |
| Plant ID | 69726 |
| Plant Name | Liberty Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | KY |
| County | Casey |
| Balancing Authority Code | PJM |
| Sector | Electric Utility |
| Generator ID | L3 |
| Nameplate Capacity (MW) | 18.1 |
| Net Summer Capacity (MW) | 17.8 |
| Net Winter Capacity (MW) | 17.8 |
| Technology | Natural Gas Internal Combustion Engine |
| Energy Source Code | NG |
| Prime Mover Code | IC |
| Planned Operation Month | 12 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 37.369331 |
| Longitude | -84.95767 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1820 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2116
Sources EV-610517949f520a19320cc73fEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7e5f92c72169ec3428ba441ebc25971594c4e7a5433582d078a00f268d4c2266
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1820
Sources EV-2a8a6deb63163a29ba003989Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ccc70e249e6795981b415da6655f9e452ee0ace886e59193d21a98489fa00662
Usage terms US government public domain
