20525 Nordhoff PV (North) / 20525
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 1.9 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-56353406ffe254894d5bc48c |
| Net Summer Capacity (MW) | 1.9 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-56353406ffe254894d5bc48c |
| Net Winter Capacity (MW) | 1.9 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-56353406ffe254894d5bc48c |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 67540 |
| Entity Name | Amiscope Nordhoff, LP |
| Plant ID | 69591 |
| Plant Name | 20525 Nordhoff PV (North) |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CA |
| County | Los Angeles |
| Balancing Authority Code | LDWP |
| Sector | IPP Non-CHP |
| Generator ID | 20525 |
| Nameplate Capacity (MW) | 1.9 |
| Net Summer Capacity (MW) | 1.9 |
| Net Winter Capacity (MW) | 1.9 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 12 |
| Planned Operation Year | 2026 |
| Status | (TS) Construction complete, but not yet in commercial operation |
| Latitude | 34.235572 |
| Longitude | -118.5811 |
| Original text | (TS) Construction complete, but not yet in commercial operation |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:551 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1963
Sources EV-4af464bd0c17d09dc649ec94Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 4733f738931743a2dad4e22edce73ffd12cb23d8fd35b53d106347c64b31f786
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:551
Sources EV-56353406ffe254894d5bc48cEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4635a6539aad456143949c4d8ba46d40826bc7a3fec1f80cbb67a132c1aa8411
Usage terms US government public domain
