Sunrise Magnolia DE / MAGNO
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 3 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-328e44eddff62b127420d12b |
| Net Summer Capacity (MW) | 3 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-328e44eddff62b127420d12b |
| Net Winter Capacity (MW) | 3 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-328e44eddff62b127420d12b |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 60531 |
| Entity Name | Standard Solar |
| Plant ID | 69560 |
| Plant Name | Sunrise Magnolia DE |
| Google Map | Map |
| Bing Map | Map |
| Plant State | DE |
| County | Kent |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | MAGNO |
| Nameplate Capacity (MW) | 3 |
| Net Summer Capacity (MW) | 3 |
| Net Winter Capacity (MW) | 3 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 3 |
| Planned Operation Year | 2027 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 39.071366 |
| Longitude | -75.49303 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:723 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1946
Sources EV-52d59431d1511729eb1b3392Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b10c9a65431378517908dac66c02877916fdd6819a215801f1d3a676afd5d2d8
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:723
Sources EV-328e44eddff62b127420d12bEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a43e46ff3327ee00c7bd97e504a8bed600e7bbfad5da90f102230009a261d38b
Usage terms US government public domain
