Pluma - SLT Grant / GRANT
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 4.8 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-c100d9e85408d293a2fcc33f |
| Net Summer Capacity (MW) | 4.8 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-c100d9e85408d293a2fcc33f |
| Net Winter Capacity (MW) | 4.8 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-c100d9e85408d293a2fcc33f |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 60531 |
| Entity Name | Standard Solar |
| Plant ID | 69558 |
| Plant Name | Pluma - SLT Grant |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NM |
| County | Grant |
| Balancing Authority Code | PNM |
| Sector | IPP Non-CHP |
| Generator ID | GRANT |
| Nameplate Capacity (MW) | 4.8 |
| Net Summer Capacity (MW) | 4.8 |
| Net Winter Capacity (MW) | 4.8 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 10 |
| Planned Operation Year | 2026 |
| Status | (TS) Construction complete, but not yet in commercial operation |
| Latitude | 32.762349 |
| Longitude | -108.1793 |
| Original text | (TS) Construction complete, but not yet in commercial operation |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:273 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1944
Sources EV-22e11309f4a1b7c1651743a0Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d9e15b48d6ab78117f82c44713e17199bb5629b2820baef5218f1c7fa1031e40
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:273
Sources EV-c100d9e85408d293a2fcc33fEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4e3d07b56728de2f985a1d9acb5fa4e1007b0dbcf87fc967b25b5914536feb99
Usage terms US government public domain
