Lyon County Generating Station / 2
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 210 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-9e5c05063cc36c21fae35c07 |
| Net Summer Capacity (MW) | 193.3 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-9e5c05063cc36c21fae35c07 |
| Net Winter Capacity (MW) | 222.5 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-9e5c05063cc36c21fae35c07 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 13781 |
| Entity Name | Northern States Power Co - Minnesota |
| Plant ID | 69537 |
| Plant Name | Lyon County Generating Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MN |
| County | Lyon |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | 2 |
| Nameplate Capacity (MW) | 210 |
| Net Summer Capacity (MW) | 193.3 |
| Net Winter Capacity (MW) | 222.5 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 12 |
| Planned Operation Year | 2028 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 44.226167 |
| Longitude | -95.75362 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1808 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1930
Sources EV-f251b9112ddb62d168e3c7fdEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 badbaca77cb455c092dcbf2ef38c010bd29595e49912753b7bf5dc98b1f34dde
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1808
Sources EV-9e5c05063cc36c21fae35c07Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 9c40cc37d580b81c30de68b847d754b97115d46955611698af83d5437dd9be65
Usage terms US government public domain