Lyon County Generating Station / 1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 210 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-10f6a2ef91e09f9241e1a24a |
| Net Summer Capacity (MW) | 193.3 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-10f6a2ef91e09f9241e1a24a |
| Net Winter Capacity (MW) | 222.5 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-10f6a2ef91e09f9241e1a24a |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 13781 |
| Entity Name | Northern States Power Co - Minnesota |
| Plant ID | 69537 |
| Plant Name | Lyon County Generating Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MN |
| County | Lyon |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | 1 |
| Nameplate Capacity (MW) | 210 |
| Net Summer Capacity (MW) | 193.3 |
| Net Winter Capacity (MW) | 222.5 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 12 |
| Planned Operation Year | 2028 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 44.226167 |
| Longitude | -95.75362 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1807 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1929
Sources EV-c63094d0bc657a48861ce032Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d4a8145eb930c84705883fb21114c59da4afa69638a9d2b022720063476af59c
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1807
Sources EV-10f6a2ef91e09f9241e1a24aEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a1f34aec0154ed83645e957952ebf097460f866073656892aea0f32705ae79a9
Usage terms US government public domain