Nutes Solar / NS1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 20 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-7d77354dfe2a758bdb5ba11b |
| Net Summer Capacity (MW) | 20 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-7d77354dfe2a758bdb5ba11b |
| Net Winter Capacity (MW) | 20 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-7d77354dfe2a758bdb5ba11b |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 67489 |
| Entity Name | Walden Renewables Development LLC |
| Plant ID | 69535 |
| Plant Name | Nutes Solar |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NH |
| County | Strafford |
| Balancing Authority Code | ISNE |
| Sector | IPP Non-CHP |
| Generator ID | NS1 |
| Nameplate Capacity (MW) | 20 |
| Net Summer Capacity (MW) | 20 |
| Net Winter Capacity (MW) | 20 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 10 |
| Planned Operation Year | 2026 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 43.375125 |
| Longitude | -71.023 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:270 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1928
Sources EV-1f232825a92ea7283ae788abEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5d7a5fc95010a3cdb5979e22f038b94e81040db1c7d545a64b3d3987fdec22d7
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:270
Sources EV-7d77354dfe2a758bdb5ba11bEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c3e6631c8aaeeeb3721969ae26d8019be18e9937ea71b4d4976b9d380d1f0eac
Usage terms US government public domain
