Brewster Solar / 1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 40 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-2f20843e7db491e91f507d7b |
| Net Summer Capacity (MW) | 40 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-2f20843e7db491e91f507d7b |
| Net Winter Capacity (MW) | 40 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-2f20843e7db491e91f507d7b |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 18454 |
| Entity Name | Tampa Electric Co |
| Plant ID | 69522 |
| Plant Name | Brewster Solar |
| Google Map | Map |
| Bing Map | Map |
| Plant State | FL |
| County | Polk |
| Balancing Authority Code | TEC |
| Sector | Electric Utility |
| Generator ID | 1 |
| Nameplate Capacity (MW) | 40 |
| Net Summer Capacity (MW) | 40 |
| Net Winter Capacity (MW) | 40 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 12 |
| Planned Operation Year | 2026 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 27.74188 |
| Longitude | -81.96187 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:541 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1921
Sources EV-c424ff0f53565569c1e14710Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 88174db23e09b988826ec5393c986f785e9a8f7dcfd9bdcbf8cd61e610a73766
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:541
Sources EV-2f20843e7db491e91f507d7bEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 30c98dada223b42a0794b5b9745d209282477bdaab63659d8493b4d7c0320e60
Usage terms US government public domain