Bluebird Solar / BBS1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 140 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-a00aa77b04925818a1d0dde6 |
| Net Summer Capacity (MW) | 140 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-a00aa77b04925818a1d0dde6 |
| Net Winter Capacity (MW) | 140 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-a00aa77b04925818a1d0dde6 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 15399 |
| Entity Name | Avangrid Power LLC |
| Plant ID | 69482 |
| Plant Name | Bluebird Solar |
| Google Map | Map |
| Bing Map | Map |
| Plant State | WA |
| County | Klickitat |
| Balancing Authority Code | BPAT |
| Sector | IPP Non-CHP |
| Generator ID | BBS1 |
| Nameplate Capacity (MW) | 140 |
| Net Summer Capacity (MW) | 140 |
| Net Winter Capacity (MW) | 140 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 12 |
| Planned Operation Year | 2027 |
| Status | (T) Regulatory approvals received. Not under construction |
| Latitude | 45.896375 |
| Longitude | -120.3031 |
| Original text | (T) Regulatory approvals received. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1359 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1896
Sources EV-fbfe934bf5ee89eeb1db0c67Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c939ee549b90877120d8336ab31cb8e6371bf16b8b540d1a436bbfc1dfc341a8
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1359
Sources EV-a00aa77b04925818a1d0dde6Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 080498ef433df32ebfeed76f28f01babac434f2f088fe63612834202d1390319
Usage terms US government public domain
