Peatville Solar Park / PETSP

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
DTE Electric Company
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
43.64, -82.8

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Peatville Solar Park / PETSP

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)185 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-a149a7353383d6f332fff9de
Net Summer Capacity (MW)185 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-a149a7353383d6f332fff9de
Net Winter Capacity (MW)185 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-a149a7353383d6f332fff9de
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID69467
Plant NamePeatville Solar Park
Google MapMap
Bing MapMap
Plant StateMI
CountySanilac
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDPETSP
Nameplate Capacity (MW)185
Net Summer Capacity (MW)185
Net Winter Capacity (MW)185
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month7
Planned Operation Year2028
Status(U) Under construction, less than or equal to 50 percent complete
Latitude43.64
Longitude-82.8
Original text(U) Under construction, less than or equal to 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1622

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1881

Sources EV-844b6f0c941d0cea7ed6a4d3
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 55f6572138254d09be4a9ae6aceb6fd53e401ff3b00857cd9e9a0d292baec2c7

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1622

Sources EV-a149a7353383d6f332fff9de
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0dff92c07b90f3607afb551351734e11221b8159c95876737790a6632082a20f

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel