Peatville Solar Park / PETSP
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 185 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-a149a7353383d6f332fff9de |
| Net Summer Capacity (MW) | 185 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-a149a7353383d6f332fff9de |
| Net Winter Capacity (MW) | 185 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-a149a7353383d6f332fff9de |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 5109 |
| Entity Name | DTE Electric Company |
| Plant ID | 69467 |
| Plant Name | Peatville Solar Park |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MI |
| County | Sanilac |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | PETSP |
| Nameplate Capacity (MW) | 185 |
| Net Summer Capacity (MW) | 185 |
| Net Winter Capacity (MW) | 185 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 7 |
| Planned Operation Year | 2028 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 43.64 |
| Longitude | -82.8 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1622 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1881
Sources EV-844b6f0c941d0cea7ed6a4d3Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 55f6572138254d09be4a9ae6aceb6fd53e401ff3b00857cd9e9a0d292baec2c7
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1622
Sources EV-a149a7353383d6f332fff9deEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0dff92c07b90f3607afb551351734e11221b8159c95876737790a6632082a20f
Usage terms US government public domain