United States of America · Generator · plant location

Elm City BESS / ECB1

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Duke Energy Progress - (NC)
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
35.789717, -77.85501

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Elm City BESS / ECB1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)20 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-f58eb8c156850da5c8e3bc93
Net Summer Capacity (MW)20 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-f58eb8c156850da5c8e3bc93
Net Winter Capacity (MW)20 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-f58eb8c156850da5c8e3bc93
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID69444
Plant NameElm City BESS
Google MapMap
Bing MapMap
Plant StateNC
CountyWilson
Balancing Authority CodeCPLE
SectorElectric Utility
Generator IDECB1
Nameplate Capacity (MW)20
Net Summer Capacity (MW)20
Net Winter Capacity (MW)20
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month9
Planned Operation Year2026
Status(V) Under construction, more than 50 percent complete
Latitude35.789717
Longitude-77.85501
Original text(V) Under construction, more than 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:124

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:27515

Sources EV-14098cbd51bbdb0bc3c0e6e3
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 bc8be2311c0b6249a312845becac966f6245586515b3b823c6a9ffe463e2522e

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:124

Sources EV-f58eb8c156850da5c8e3bc93
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 42017894ea8182ee6d73a2984ddb291aa12a3c4c05cc75b752a33dbf1ce718ed

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel