Medicine Bow / 12
Generator · Cancelled or postponed
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 0.7 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-23f86d05366d4f762ee9c4e6 |
| Net Summer Capacity (MW) | 0.7 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-23f86d05366d4f762ee9c4e6 |
| Net Winter Capacity (MW) | 0.7 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-23f86d05366d4f762ee9c4e6 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 62042 |
| Entity Name | SRIV Partnership LLC |
| Plant ID | 692 |
| Plant Name | Medicine Bow |
| Google Map | Map |
| Bing Map | Map |
| Plant State | WY |
| County | Carbon |
| Balancing Authority Code | WAUW |
| Sector | IPP Non-CHP |
| Generator ID | 12 |
| Nameplate Capacity (MW) | 0.7 |
| Net Summer Capacity (MW) | 0.7 |
| Net Winter Capacity (MW) | 0.7 |
| Technology | Onshore Wind Turbine |
| Energy Source Code | WND |
| Prime Mover Code | WT |
| Latitude | 41.835278 |
| Longitude | -106.2428 |
| Original text | Canceled or Postponed |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Canceled or Postponed:21 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:474
Sources EV-ce1808213078dbddd46cb78eEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f767b2143c9402d360ebef14e064a8976d2152a94d9fe091e98405c25cd2eda5
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:21
Sources EV-23f86d05366d4f762ee9c4e6Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 06ec1219d34fbd49c792c61bb8573920fe724131ceea28fc232212f467e0b2cd
Usage terms US government public domain
