United States of America · Generator · plant location

Eastern Cottontail Solar / COT01

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
EDF Renewables Development, Inc.
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
39.844172, -82.49453

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Eastern Cottontail Solar / COT01

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)220 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-14a1b6c8fa5b72ccf2de6a5f
Net Summer Capacity (MW)254.5 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-14a1b6c8fa5b72ccf2de6a5f
Net Winter Capacity (MW)118.2 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-14a1b6c8fa5b72ccf2de6a5f
Detailed source fields
Original source fieldPublished value or condition
Entity ID64452
Entity NameEDF Renewables Development, Inc.
Plant ID69108
Plant NameEastern Cottontail Solar
Google MapMap
Bing MapMap
Plant StateOH
CountyFairfield
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDCOT01
Nameplate Capacity (MW)220
Net Summer Capacity (MW)254.5
Net Winter Capacity (MW)118.2
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month12
Planned Operation Year2028
Status(L) Regulatory approvals pending. Not under construction
Latitude39.844172
Longitude-82.49453
Original text(L) Regulatory approvals pending. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1799

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1658

Sources EV-ed959444a8bcb1cb8ee3174b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c1aff947a03fd0da43626394ed5ded97215d2fecb3f95d16625bfb8326ff4314

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1799

Sources EV-14a1b6c8fa5b72ccf2de6a5f
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 103b1e473b57a4faf7ec0fb64b04839ab8de8744fcc5c29355eaee831f3c5427

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel