Orion - Helion / HEWA1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 50 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-200c7dfb7899eac8a090d367 |
| Net Summer Capacity (MW) | 50 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-200c7dfb7899eac8a090d367 |
| Net Winter Capacity (MW) | 50 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-200c7dfb7899eac8a090d367 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 67250 |
| Entity Name | Helion Energy, Inc. |
| Plant ID | 69099 |
| Plant Name | Orion - Helion |
| Google Map | Map |
| Bing Map | Map |
| Plant State | WA |
| County | Chelan |
| Balancing Authority Code | CHPD |
| Sector | IPP Non-CHP |
| Generator ID | HEWA1 |
| Nameplate Capacity (MW) | 50 |
| Net Summer Capacity (MW) | 50 |
| Net Winter Capacity (MW) | 50 |
| Technology | All Other |
| Energy Source Code | H2 |
| Prime Mover Code | OT |
| Planned Operation Month | 12 |
| Planned Operation Year | 2028 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 47.3368 |
| Longitude | -120.1043 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1798 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1647
Sources EV-c6cbb2cab9fbf668a234227aEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ef1f8e68ef284fb8ab73c5c17bada62734ae29b4e7cd15d54cfcd3100853637f
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1798
Sources EV-200c7dfb7899eac8a090d367Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 95d20d4c4ed0abf603bc5705840498089b0dcb93fa98e6bdaf2e71992f9f006f
Usage terms US government public domain