Bison Generation Station / CT1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 496 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-00d52d87ae569f5a70d48a28 |
| Net Summer Capacity (MW) | 409 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-00d52d87ae569f5a70d48a28 |
| Net Winter Capacity (MW) | 409 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-00d52d87ae569f5a70d48a28 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 1307 |
| Entity Name | Basin Electric Power Coop |
| Plant ID | 69071 |
| Plant Name | Bison Generation Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | ND |
| County | Williams |
| Balancing Authority Code | SWPP |
| Sector | Electric Utility |
| Generator ID | CT1 |
| Unit Code | CC1 |
| Nameplate Capacity (MW) | 496 |
| Net Summer Capacity (MW) | 409 |
| Net Winter Capacity (MW) | 409 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Planned Operation Month | 2 |
| Planned Operation Year | 2029 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 48.327932 |
| Longitude | -103.3127 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1857 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1644
Sources EV-b1e5d9d6ae3456ccb13e73b5Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 51bdab79ebf7549d5a2979f3cabb12e192beeb5967faeea58fc83a7839dd5925
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1857
Sources EV-00d52d87ae569f5a70d48a28Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b88fe944c9db98594b1ebf852cfc9fbc826722cb48fc0d3fa471073518878ef7
Usage terms US government public domain