Sherco LDES / SHB01
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 10 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-10b58707fea4c09ea0c83394 |
| Net Summer Capacity (MW) | 10 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-10b58707fea4c09ea0c83394 |
| Net Winter Capacity (MW) | 10 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-10b58707fea4c09ea0c83394 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 13781 |
| Entity Name | Northern States Power Co - Minnesota |
| Plant ID | 68988 |
| Plant Name | Sherco LDES |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MN |
| County | Sherburne |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | SHB01 |
| Nameplate Capacity (MW) | 10 |
| Net Summer Capacity (MW) | 10 |
| Net Winter Capacity (MW) | 10 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 5 |
| Planned Operation Year | 2028 |
| Status | (T) Regulatory approvals received. Not under construction |
| Latitude | 45.374997 |
| Longitude | -93.89719 |
| Original text | (T) Regulatory approvals received. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1528 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1608
Sources EV-75a4caa549f7d242c9da533dEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 203e9eec9bb07f3747b9619a80e7164766081cb898bf28f0c96bf68177bb5c1f
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1528
Sources EV-10b58707fea4c09ea0c83394Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7ba5d0c08e26ab5b66079d09453b6be5c1d6751c80cee87c215a9711982fa007
Usage terms US government public domain