Beavertail Solar / BS
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 400 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-e22598d24881994deba8382a |
| Net Summer Capacity (MW) | 400 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-e22598d24881994deba8382a |
| Net Winter Capacity (MW) | 400 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-e22598d24881994deba8382a |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 67165 |
| Entity Name | Beavertail Solar, LLC |
| Plant ID | 68917 |
| Plant Name | Beavertail Solar |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MO |
| County | Henry |
| Balancing Authority Code | SPA |
| Sector | IPP Non-CHP |
| Generator ID | BS |
| Nameplate Capacity (MW) | 400 |
| Net Summer Capacity (MW) | 400 |
| Net Winter Capacity (MW) | 400 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 4 |
| Planned Operation Year | 2027 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 38.311814 |
| Longitude | -93.93546 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:772 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1574
Sources EV-46a3eba4985b202d049b9b3dEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 13b3d2fc4bb7ccd692dda1efdb0651db3f21675c9ebf18b61948ac7d15bdc976
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:772
Sources EV-e22598d24881994deba8382aEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 81c1e3e4612e34b8559313cd9fa42da4760f26cbb17808a2b1844de04c71c4d4
Usage terms US government public domain
