Eagle Creek Solar Park LLC / ECS1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 120 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-5274242b9cb2621fcb27b496 |
| Net Summer Capacity (MW) | 120 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-5274242b9cb2621fcb27b496 |
| Net Winter Capacity (MW) | 120 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-5274242b9cb2621fcb27b496 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 67140 |
| Entity Name | Eagle Creek Solar Park LLC |
| Plant ID | 68898 |
| Plant Name | Eagle Creek Solar Park LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MI |
| County | Saginaw |
| Balancing Authority Code | MISO |
| Sector | IPP Non-CHP |
| Generator ID | ECS1 |
| Nameplate Capacity (MW) | 120 |
| Net Summer Capacity (MW) | 120 |
| Net Winter Capacity (MW) | 120 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 3 |
| Planned Operation Year | 2027 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 43.308523 |
| Longitude | -84.21895 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:719 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1559
Sources EV-6300b96ed01ebcc953669a07Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1d58fdec590dbe18dd38d88d1d06d732f7a80da1246cfac9fa9e602ab119935a
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:719
Sources EV-5274242b9cb2621fcb27b496Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 94c65097d615b16575a1d9113a7c66a4d40a5e412b0258b8b7b82e210a8ddd4a
Usage terms US government public domain
