Ambersweet / 1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 74.5 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-fd6330ecb7ca02baf4645cd6 |
| Net Summer Capacity (MW) | 74.5 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-fd6330ecb7ca02baf4645cd6 |
| Net Winter Capacity (MW) | 74.5 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-fd6330ecb7ca02baf4645cd6 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 6452 |
| Entity Name | Florida Power & Light Co |
| Plant ID | 68829 |
| Plant Name | Ambersweet |
| Google Map | Map |
| Bing Map | Map |
| Plant State | FL |
| County | Indian River |
| Balancing Authority Code | FPL |
| Sector | Electric Utility |
| Generator ID | 1 |
| Nameplate Capacity (MW) | 74.5 |
| Net Summer Capacity (MW) | 74.5 |
| Net Winter Capacity (MW) | 74.5 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 4 |
| Planned Operation Year | 2027 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 27.567468 |
| Longitude | -80.62782 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:769 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1519
Sources EV-fd3bd1e7152af2b146f1e92fEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 6ca57a030632f406188403bc7ffcd4dc9fb7245bd519c8cd725b88e14cb30e19
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:769
Sources EV-fd6330ecb7ca02baf4645cd6Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8b16bf48f38bfe3137bcf8c2ca65b222afef1cd1a7b8f22428f9821b5b001892
Usage terms US government public domain