SR Magnolia / MAGNA
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 160 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-ddf8d2871765c75edf106fb0 |
| Net Summer Capacity (MW) | 160 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-ddf8d2871765c75edf106fb0 |
| Net Winter Capacity (MW) | 160 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-ddf8d2871765c75edf106fb0 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 66933 |
| Entity Name | SR Magnolia, LLC |
| Plant ID | 68559 |
| Plant Name | SR Magnolia |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MS |
| County | Monroe |
| Balancing Authority Code | TVA |
| Sector | IPP Non-CHP |
| Generator ID | MAGNA |
| Nameplate Capacity (MW) | 160 |
| Net Summer Capacity (MW) | 160 |
| Net Winter Capacity (MW) | 160 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 6 |
| Planned Operation Year | 2027 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 33.856467 |
| Longitude | -88.67488 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:874 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1400
Sources EV-33908f8768a81b53d664ede6Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b6ecd88fdc5c3c829f57bf71e7c68781d62cff31375c9ee374ca1c86a3d1dfd6
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:874
Sources EV-ddf8d2871765c75edf106fb0Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 cd4378386b44c650f78e1b318adfee0f3cc9922609f0328ad68582cc204bfc52
Usage terms US government public domain
