Crowned Heron 2 - Storage, LLC / CWH2
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 150 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-e9e974976b999c0fe6ba599e |
| Net Summer Capacity (MW) | 150 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-e9e974976b999c0fe6ba599e |
| Net Winter Capacity (MW) | 150 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-e9e974976b999c0fe6ba599e |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 67192 |
| Entity Name | RWE Clean Energy |
| Plant ID | 68500 |
| Plant Name | Crowned Heron 2 - Storage, LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Fort Bend |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | CWH2 |
| Nameplate Capacity (MW) | 150 |
| Net Summer Capacity (MW) | 150 |
| Net Winter Capacity (MW) | 150 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 10 |
| Planned Operation Year | 2026 |
| Status | (TS) Construction complete, but not yet in commercial operation |
| Latitude | 29.482673 |
| Longitude | -95.61996 |
| Original text | (TS) Construction complete, but not yet in commercial operation |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:233 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1362
Sources EV-c4a1e9bbb274578f2fa91815Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 41e55eabb028ca41e75466e5380dca9656a3f11bbb4be3c86cd147c12ea2cf88
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:233
Sources EV-e9e974976b999c0fe6ba599eEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a4e2ef0eaa568ea981df42b94f67a1801b786e95c886f71bdb514807b99ded18
Usage terms US government public domain
