Crooked Trail Solar / CTS1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 68 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-5a12af492142713dc02e005c |
| Net Summer Capacity (MW) | 68 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-5a12af492142713dc02e005c |
| Net Winter Capacity (MW) | 68 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-5a12af492142713dc02e005c |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 64457 |
| Entity Name | VCP Realty, LLC |
| Plant ID | 68416 |
| Plant Name | Crooked Trail Solar |
| Google Map | Map |
| Bing Map | Map |
| Plant State | ME |
| County | Penobscot |
| Balancing Authority Code | ISNE |
| Sector | IPP Non-CHP |
| Generator ID | CTS1 |
| Nameplate Capacity (MW) | 68 |
| Net Summer Capacity (MW) | 68 |
| Net Winter Capacity (MW) | 68 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 10 |
| Planned Operation Year | 2029 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 45.144194 |
| Longitude | -68.58603 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1990 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1313
Sources EV-c04c327a7f07e7c8709aada3Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d2a9d8ee7864f50515318dc2c91d96d3e0dc16c2fbc50b65d41219b928b77655
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1990
Sources EV-5a12af492142713dc02e005cEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a257e3a8db901bbf31ed6b5c861d49576a58d059452ca6b5a05dd0c7b82567f7
Usage terms US government public domain
