United States of America · Generator · plant location

AES Rt 5 Solar CSG / RT5SS

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
AES Clean Energy
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
42.97347, -78.01527

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

AES Rt 5 Solar CSG / RT5SS

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)5 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-927017470e467ef905d6bdd7
Net Summer Capacity (MW)4.9 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-927017470e467ef905d6bdd7
Net Winter Capacity (MW)1 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-927017470e467ef905d6bdd7
Detailed source fields
Original source fieldPublished value or condition
Entity ID64904
Entity NameAES Clean Energy
Plant ID68388
Plant NameAES Rt 5 Solar CSG
Google MapMap
Bing MapMap
Plant StateNY
CountyGenesee
Balancing Authority CodeNYIS
SectorIPP Non-CHP
Generator IDRT5SS
Nameplate Capacity (MW)5
Net Summer Capacity (MW)4.9
Net Winter Capacity (MW)1
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month9
Planned Operation Year2026
Status(V) Under construction, more than 50 percent complete
Latitude42.97347
Longitude-78.01527
Original text(V) Under construction, more than 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:75

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1301

Sources EV-f8b858d2e0fd161a53f3c588
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 72176f5ff908e12475058ef5db220ef3a7d9a4a1af0ab496b909d747cf34cba8

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:75

Sources EV-927017470e467ef905d6bdd7
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 97e7c2c2ca919b14288c0582fd18265755c19e87f0188db363cafa50c8eb38f4

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel