Anthelope Hills Solar Generation BESS / ARFL2
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 200 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-8602213b48f392d5e80b309d |
| Net Summer Capacity (MW) | 200 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-8602213b48f392d5e80b309d |
| Net Winter Capacity (MW) | 200 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-8602213b48f392d5e80b309d |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 66711 |
| Entity Name | ARFL bn, LLC |
| Plant ID | 68315 |
| Plant Name | Anthelope Hills Solar Generation BESS |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MT |
| County | Beaverhead |
| Balancing Authority Code | NWMT |
| Sector | IPP Non-CHP |
| Generator ID | ARFL2 |
| Nameplate Capacity (MW) | 200 |
| Net Summer Capacity (MW) | 200 |
| Net Winter Capacity (MW) | 200 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 12 |
| Planned Operation Year | 2027 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 45.05029 |
| Longitude | -113.0588 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1313 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1241
Sources EV-4de03b0c7997f2e842998d1aEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ce07ff060673cf53ec6a837a3861dfa8561fbd22e56a86a548fa92b013cf7386
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1313
Sources EV-8602213b48f392d5e80b309dEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 865a7c25ee6d2a261178a07c514cc02d3096507443da924f1eef840cb594f313
Usage terms US government public domain
