Franklin Farms 1&2 / 1A
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 469.3 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-507b468e3594835446cd584a |
| Net Summer Capacity (MW) | 435.4 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-507b468e3594835446cd584a |
| Net Winter Capacity (MW) | 469.3 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-507b468e3594835446cd584a |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 11241 |
| Entity Name | Entergy Louisiana LLC |
| Plant ID | 68214 |
| Plant Name | Franklin Farms 1&2 |
| Google Map | Map |
| Bing Map | Map |
| Plant State | LA |
| County | Richland |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | 1A |
| Unit Code | CC01 |
| Nameplate Capacity (MW) | 469.3 |
| Net Summer Capacity (MW) | 435.4 |
| Net Winter Capacity (MW) | 469.3 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Planned Operation Month | 12 |
| Planned Operation Year | 2028 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 32.53246 |
| Longitude | -91.62767 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1781 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1155
Sources EV-560699f6c4037faf4b09f5d6Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 dcc36adf1860bbcbc67356dd97074f0904aff0197e4e925206bf64eabb32e343
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1781
Sources EV-507b468e3594835446cd584aEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 413fc8b06bde307581e6e7ddf7ab6798193a452264926f6de4662f5d4ee49e46
Usage terms US government public domain
