Blue Ridge Solar / BLUER
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 95 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-920a9b7acb0092695b33f895 |
| Net Summer Capacity (MW) | 95 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-920a9b7acb0092695b33f895 |
| Net Winter Capacity (MW) | 95 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-920a9b7acb0092695b33f895 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 58468 |
| Entity Name | Dominion Renewable Energy |
| Plant ID | 68073 |
| Plant Name | Blue Ridge Solar |
| Google Map | Map |
| Bing Map | Map |
| Plant State | VA |
| County | Pittsylvania |
| Balancing Authority Code | PJM |
| Sector | Electric Utility |
| Generator ID | BLUER |
| Nameplate Capacity (MW) | 95 |
| Net Summer Capacity (MW) | 95 |
| Net Winter Capacity (MW) | 95 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 3 |
| Planned Operation Year | 2027 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 36.790101 |
| Longitude | -79.42875 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:704 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1063
Sources EV-183e61714d1b509411f8bef7Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 3e733990549821b7fac3e9a365bc8ff9ee4315b9e3e54e8c94a7a5046f3b201b
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:704
Sources EV-920a9b7acb0092695b33f895Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 394874f723f77e3f774fbe5e2d6711c51a0e79ce4f3e0dcd027181f5de676d9d
Usage terms US government public domain