United States of America · Generator · plant location

Bridleton Solar / BRIDL

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Dominion Renewable Energy
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
37.46, -77.27

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Bridleton Solar / BRIDL

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)20 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-702946621ac2779546add20b
Net Summer Capacity (MW)20 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-702946621ac2779546add20b
Net Winter Capacity (MW)20 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-702946621ac2779546add20b
Detailed source fields
Original source fieldPublished value or condition
Entity ID58468
Entity NameDominion Renewable Energy
Plant ID68072
Plant NameBridleton Solar
Google MapMap
Bing MapMap
Plant StateVA
CountyHenrico
Balancing Authority CodePJM
SectorElectric Utility
Generator IDBRIDL
Nameplate Capacity (MW)20
Net Summer Capacity (MW)20
Net Winter Capacity (MW)20
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month10
Planned Operation Year2028
Status(L) Regulatory approvals pending. Not under construction
Latitude37.46
Longitude-77.27
Original text(L) Regulatory approvals pending. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1695

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1062

Sources EV-64e7e2ec3ca8668c53dfcc0c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f564c1d70b808bdadfc98d0e7cdd27af1911767e4bf49b79c846803849a78d8d

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1695

Sources EV-702946621ac2779546add20b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8e7662714db4022ed9c419d5c3f8e6515bacc21bc20921148568d84e1ae8ef9e

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel