Robeson Solar I / ROBSS
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 28 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-a4e544b4c22bf07f37cc4731 |
| Net Summer Capacity (MW) | 28 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-a4e544b4c22bf07f37cc4731 |
| Net Winter Capacity (MW) | 28 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-a4e544b4c22bf07f37cc4731 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 64904 |
| Entity Name | AES Clean Energy |
| Plant ID | 68043 |
| Plant Name | Robeson Solar I |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NC |
| County | Robeson |
| Balancing Authority Code | CPLE |
| Sector | IPP Non-CHP |
| Generator ID | ROBSS |
| Nameplate Capacity (MW) | 28 |
| Net Summer Capacity (MW) | 28 |
| Net Winter Capacity (MW) | 28 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 12 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 34.614574 |
| Longitude | -78.93468 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1776 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1045
Sources EV-22a40bf76c45acd09cc09ab1Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 155851efd996b29d29a07fdfd584ac2ea068a91372c8b2a50acfafba10c7dcf6
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1776
Sources EV-a4e544b4c22bf07f37cc4731Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f89b9b38b57c2126d8ca1d4b4f3794d8a0a22cddf3f7956e841f5cda65b32f68
Usage terms US government public domain
