United States of America · Generator · plant location

Sycamore Cross Solar / SYCAM

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
AES Clean Energy
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
37.017425, -76.74399

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Sycamore Cross Solar / SYCAM

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)208.2 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-30f2dd02e5d50dcdbb2521a5
Net Summer Capacity (MW)208.2 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-30f2dd02e5d50dcdbb2521a5
Net Winter Capacity (MW)208.2 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-30f2dd02e5d50dcdbb2521a5
Detailed source fields
Original source fieldPublished value or condition
Entity ID64904
Entity NameAES Clean Energy
Plant ID68040
Plant NameSycamore Cross Solar
Google MapMap
Bing MapMap
Plant StateVA
CountyIsle of Wight
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDSYCAM
Nameplate Capacity (MW)208.2
Net Summer Capacity (MW)208.2
Net Winter Capacity (MW)208.2
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month6
Planned Operation Year2029
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude37.017425
Longitude-76.74399
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1912

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1043

Sources EV-6a781a925029fa2e90555361
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 291be48b0159e2617a13c6c9300826ec59c967ee8d06c85e665fc391b1f38408

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1912

Sources EV-30f2dd02e5d50dcdbb2521a5
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 cd331096381cd01c8094e10ce8ef0b3e1ebe66443beab5b8f065c23bb176e62b

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel