Sunscape Renewable Energy / SNSCP
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 500 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-388bc69aa9e53cf76988f205 |
| Net Summer Capacity (MW) | 500 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-388bc69aa9e53cf76988f205 |
| Net Winter Capacity (MW) | 500 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-388bc69aa9e53cf76988f205 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 64545 |
| Entity Name | Vesper Energy Development LLC |
| Plant ID | 68034 |
| Plant Name | Sunscape Renewable Energy |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Nueces |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | SNSCP |
| Nameplate Capacity (MW) | 500 |
| Net Summer Capacity (MW) | 500 |
| Net Winter Capacity (MW) | 500 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 10 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 27.819197 |
| Longitude | -97.79994 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1693 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1036
Sources EV-a31797899b46b2143d6eb323Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 9d24c9653dd351e4841a823922246637cbd858a554326e0f76a8759877993fb5
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1693
Sources EV-388bc69aa9e53cf76988f205Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 35c3d8018b8858018821883da846a06679ad6646b1dad57b5b107020ab896e75
Usage terms US government public domain