United States of America · Generator · plant location

Skylight Renewable Energy / SKREB

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Vesper Energy Development LLC
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
38.947494, -121.4792

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Skylight Renewable Energy / SKREB

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)100 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-600c9d2b3c26935579d4eb98
Net Summer Capacity (MW)100 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-600c9d2b3c26935579d4eb98
Net Winter Capacity (MW)100 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-600c9d2b3c26935579d4eb98
Detailed source fields
Original source fieldPublished value or condition
Entity ID64545
Entity NameVesper Energy Development LLC
Plant ID68032
Plant NameSkylight Renewable Energy
Google MapMap
Bing MapMap
Plant StateCA
CountySutter
Balancing Authority CodeWALC
SectorIPP Non-CHP
Generator IDSKREB
Nameplate Capacity (MW)100
Net Summer Capacity (MW)100
Net Winter Capacity (MW)100
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month6
Planned Operation Year2028
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude38.947494
Longitude-121.4792
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1566

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1032

Sources EV-0e8a3ebb99e2a86198ece9ad
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 96424fd3a3a5a07ca519145daa9aa405eddd0622e15b9a80139d153d28cc3f6e

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1566

Sources EV-600c9d2b3c26935579d4eb98
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e393ea9cd04a8284c9c07c517d4eac47a6149ae78b7a0c59d35c812c4e9a32ce

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel