United States of America · Generator · plant location

Skylight Renewable Energy / SKLRE

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Vesper Energy Development LLC
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
38.947494, -121.4792

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Skylight Renewable Energy / SKLRE

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)100 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-987ce2f4447d20ad52dd755a
Net Summer Capacity (MW)100 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-987ce2f4447d20ad52dd755a
Net Winter Capacity (MW)100 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-987ce2f4447d20ad52dd755a
Detailed source fields
Original source fieldPublished value or condition
Entity ID64545
Entity NameVesper Energy Development LLC
Plant ID68032
Plant NameSkylight Renewable Energy
Google MapMap
Bing MapMap
Plant StateCA
CountySutter
Balancing Authority CodeWALC
SectorIPP Non-CHP
Generator IDSKLRE
Nameplate Capacity (MW)100
Net Summer Capacity (MW)100
Net Winter Capacity (MW)100
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month6
Planned Operation Year2028
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude38.947494
Longitude-121.4792
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1565

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1031

Sources EV-2f85b1d8391326d844cd6f56
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d44a7c9f450166a7270890c813f2cd1b6f7dd291b6eba3cb92b72959984d419e

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1565

Sources EV-987ce2f4447d20ad52dd755a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 523c134a270b3839399289416657b12e8be5514b57d0265c98276f84b1129252

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel