United States of America · Generator · plant location

Merced BESS / MRCDB

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
ZGlobal Inc
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
36.989396, -120.8775

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Merced BESS / MRCDB

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)3 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-c2f4f3251df05b6cd7e967db
Net Summer Capacity (MW)3 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-c2f4f3251df05b6cd7e967db
Net Winter Capacity (MW)3 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-c2f4f3251df05b6cd7e967db
Detailed source fields
Original source fieldPublished value or condition
Entity ID60059
Entity NameZGlobal Inc
Plant ID68018
Plant NameMerced BESS
Google MapMap
Bing MapMap
Plant StateCA
CountyMerced
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDMRCDB
Nameplate Capacity (MW)3
Net Summer Capacity (MW)3
Net Winter Capacity (MW)3
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month9
Planned Operation Year2026
Status(TS) Construction complete, but not yet in commercial operation
Latitude36.989396
Longitude-120.8775
Original text(TS) Construction complete, but not yet in commercial operation
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:64

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1014

Sources EV-1e9e1c47c587e132b165c416
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 fd24d63565f439a769fe466e86ad6d0ffc74c6b0e8ced5e4a9f4b7d9f92ce298

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:64

Sources EV-c2f4f3251df05b6cd7e967db
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8322d049070fb6967687e45df4101f4cd674543938c802b56c512d87a933ad06

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel